Project Information
Client:
Total Construction
Architect:
BN Group
Consultant Engineer:
Adams
Sector:
Industrial
Project Location:
25-27 Denison Street Wollongong NSW 2500
Project Brief
Storage King Wollongong
PTC was engaged by Total Construction to deliver the design and supply of post-tensioning systems for this contemporary industrial storage facility. The development comprises multi-level storage units, integrated office spaces, and well-planned circulation areas, supported by advanced vertical transportation systems for seamless access and efficiency. PTC’s involvement ensured a robust and adaptable structural solution, contributing to the creation of a modern, high-performing facility built to meet the evolving needs of industrial and commercial users.
Constructed By:
Project Stats
- Service: D&C
- Total man hours: 1557
- Post-Tension Tonnage: 45
- Total m3 Concrete: 8193
- Linear Metres of Strand: 56616