Project Information
Client:
Decode
Architect:
PA Studio
Consultant Engineer:
SCP
Sector:
Residential
Project Location:
178-188 Pacific Highway Greenwich NSW 2065
Project Brief
The Bellevue Greenwich
PTC was responsible for the post-tensioning design and supply across this high-end residential development, delivering a structural solution that complements its architectural sophistication. The project reflects a commitment to quality and precision, with PTC’s expertise ensuring efficiency, durability, and seamless integration throughout the build.
Constructed By:
Project Stats:
- Service: D&C
- Total man hours: 1264
- Post-Tension Tonnage: 35
- Total m3 Concrete: 6397
- Linear Metres of Strand: 44911
