Project Information
Client:
Pheonix Builders
Architect:
Deadalus
Consultant Engineer:
abc Consultants
Sector:
Residential
Project Location:
4-12 RAILWAY STREET LIDCOMBE
Project Brief
Lidcombe Central
PTC was engaged to deliver the supply and installation of post-tensioned slab systems for this multi-storey residential development. The scope encompassed detailed shop drawing preparation, stressing and grouting operations, and close coordination with the builder to achieve efficient and high-quality post-tensioned floorplates across all apartment levels and podium areas. PTC’s involvement ensured structural precision, durability, and seamless project integration from design through to completion.
Constructed By:
Project Stats:
- Service: S&I
- Total man hours: N/A
- Post-Tension Tonnage: 280
- Total m3 Concrete: N/A
- Linear Metres of Strand: 356234
